CivilBolt.ai
IRC Codes
IRC CodePavement2014 (First Revision)
IRC:SP:49

Guidelines for the Use of Dry Lean Concrete as Sub-base for Rigid Pavement

View at irc.nic.in

What this code covers

DLC mix proportioning, materials including fly ash and GGBFS admixtures, subgrade preparation, and construction procedures. Minimum thickness: 150mm for NH/SH, 100mm for other roads.

What this means on site

Essential for rigid pavement projects with DLC sub-base. The 2014 revision reduced the 7-day compressive strength benchmark to 7 MPa. Fly ash use reduces material costs.

Get the right IRC clauses in every spec and submittal.

CivilBolt pulls the IRC references your contract cites and flags non-compliance before the IE does. No more spec hunting across PDFs.